mountain trike - Tim Morgan all terrain wheelchair

Mountain Trike: one golden thread from enquiry to dispatch

Mountain Trike designs and builds all-terrain wheelchairs in Nantwich, Cheshire. In 2020, with a team of nine and a business that had outgrown its spreadsheets and Word documents, MD and founder Tim Morgan went looking for one system that would cover everything. Six years on, Flowlens is where every Mountain Trike order starts and finishes.

At a glance

  • Company: Mountain Trike, designer and manufacturer of all-terrain wheelchairs
  • Location: Nantwich, Cheshire, UK
  • Team size when Flowlens was introduced: 9 (2020)
  • Used for: enquiries, CRM and sales leads, quotes, sales orders, invoicing (linked to Xero), MRP for production and job cards, purchasing, stock control, dispatch, servicing, BOMs and reporting
  • Build lead times: down from 12–14 weeks (20–25 at peak) to around 2–4 weeks, helped by supply chain changes and bringing chassis fabrication in house, with Flowlens managing that production
  • Time saved: roughly one full-time role’s worth, spread across the business
  • Capterra rating: 5.0

The challenge

By 2020 Mountain Trike had grown well beyond its start-up days. Production had grown, the range had grown and so had the number of enquiries, but the systems behind it hadn’t kept up. Invoices were Word documents. Leads lived in shared spreadsheets. Stock control was manual. Several separate online systems didn’t talk to each other, so a lot of time went on re-entering data and sorting out the bottlenecks between them.

Stock was the biggest headache. As Tim puts it: “We didn’t have an effective stock control system, so we spent a lot of time double checking stock with manual counts and complex spreadsheets.” Those problems contributed to delays in builds and long lead times, and the day-to-day admin and order processing pulled attention away from more productive work like developing the business.

Tim also needed something cloud-based, because some of the team worked from home or in different parts of the country.

Why Flowlens

Tim’s search turned up systems that covered the accounting side, production, or just the CRM side, but nothing that joined up the whole business. The more he looked, the less the options suited a manufacturer building a product from lots of components, and stock management was where most of them fell short. His searches kept hitting dead ends until he found Flowlens MRP software.

“As soon as Rich described how Flowlens could cover all aspects of the business, I knew this was the system I needed.”

Tim describes that first call as clear, “with no sales pressure or baffling jargon”.

Getting up and running

Mountain Trike started using Flowlens in 2020, during the pandemic, and brought it in a stage at a time: invoicing first, then stock, and so on until it was running everything. Tim is upfront that the main challenge was the time needed for setup, collating the BOMs into components lists and listing every part. Any system would need that time to move over from old methods, and once the data is in, updating a components list is simple.

The Flowlens onboarding team were, in Tim’s words, “extremely helpful in explaining the process and providing all the tools to set up our products on the system”.

How Mountain Trike uses Flowlens

From enquiry to invoice

Enquiries from the Mountain Trike website feed straight into Flowlens. The team responds, works out what the customer needs, generates a quote and tracks the enquiry as a sales lead. When the customer orders, it becomes a sales order, the invoice syncs to Xero, and the production project and job cards are created from the same record.

“It’s this golden thread of data from an inquiry coming in through to the sales quotation, sales lead management, sales order, the invoice, the production project and job card, the dispatch of parts, the invoicing link to Xero.”

Because the system is so easy to use, a single admin team member handles incoming enquiries, quotes, sales leads and sales orders without pulling anyone else in. Tim’s own routine is the same: after his email, the first tab he opens each day is Flowlens.

Stock and dispatch for a 400-part product

A Mountain Trike is built from a bill of materials of around 400 components. Roughly 80% are common across models, and the other 20% are specific to the model or to the accessories a customer has ordered. When an order is dispatched, Flowlens MRP software deducts exactly those parts.

“Being able to dispatch this exact order and have it deduct exactly those parts is just brilliant. It means our stock’s accurate.”

Deliveries are booked in with goods received notes, which updates stock straight away. Tim says that simplicity is why it works: “The fact it’s that simple to use means people do it, and we keep on top of it. It’s not an extra job updating the system.”

Purchasing

Every part has a stock warning level set to match its lead time, from next-day delivery to four months. A stock report at the start of each week shows what’s running low, so the team orders what it needs instead of ordering lots of everything just in case. Suppliers are set up in the system, so repeating an earlier purchase order is a matter of duplicating it and amending quantities, and everyone can see what’s been ordered rather than it sitting in a file on one person’s computer.

Bills of materials that work for production and for sales

The main component list for each trike is one flat list of individual parts. That was the easiest way to manage it, and it makes stock deduction and version updates simple. But Mountain Trike also builds separate sub-assembly lists for sales. If a customer needs a replacement footrest assembly, a team member can pick “right-hand footrest bracket assembly” (a five-part list) instead of selecting every pillar, bracket and bolt individually. It’s a small thing that makes selling spares and accessories much quicker.

In-house manufacturing

Following a major change in the supply chain, Mountain Trike sources components from multiple suppliers rather than keeping all its eggs in one basket, and has brought chassis fabrication, welding and tube bending in house. Flowlens manages that production: Projects and Job Cards for chassis welding, and Purchase Orders for raw materials and stock control.

Servicing

Service quotes and service invoices are handled in the same system as the original sale, so a customer coming back for a service is part of the same flow.

Results

Shorter lead times. Build lead times have fallen from 12–14 weeks (and as long as 20–25 at peak) to around 2–4 weeks. Tim is clear it’s a combination of factors, including the supply chain changes and the move to in-house fabrication. “Flowlens definitely contributed very well to this reduction in lead times as it enables us to manage this in-house manufacture effectively.”

Time saved across the business. “I believe the improvements and high level of efficiency Flowlens offers would equal one full-time role, but spread across various functions. So Flowlens saves time in all areas of the business: sales, purchasing, production, servicing, customer management, reporting.”

Accurate stock. Exact parts deducted at dispatch, goods received booked in as they arrive, and weekly stock reports mean the manual counts and complex spreadsheets are gone.

Something the whole team uses. From production to sales, Tim says everyone gets on well with it. “Flowlens makes these fundamental business activities so efficient and user friendly, it’s hard to imagine how we managed before!”

For a small team, the benefit is bigger still. “When you’ve just got a handful of you, a system like this that covers everything in such an efficient way is just so beneficial to the business.”

Support

“Whenever we’ve needed technical support they have been quick to respond and offer a very personal approach which we wouldn’t get elsewhere. They listen to feedback and ongoing improvements have been made to Flowlens as we all evolve. I recommend Flowlens to any business.”

About Mountain Trike

Mountain Trike’s mission is to enable people of all abilities to access and enjoy the countryside with a range of all-terrain, off-road wheelchairs. They’re available manual or electric assist, for people who self-propel (the Mountain Trike and eTrike), for those pushed by a friend or relative (the MT Push and E-Push), and in a full power version, the ST Motion.

The company was founded by Tim Morgan, a master of engineering and the inventor of the Mountain Trike. It grew out of his love of mountain biking growing up in Mid Wales and the realisation that no practical, off-road capable wheelchair existed for people who wanted to enjoy the countryside after a life-changing injury or illness. He developed the first prototype at university and carried on alongside a graduate job at Bentley, until the company could go full time. The Mountain Trike has now been on sale for 15 years, with customers around the world.

Visit the Mountain Trike website for more details.

FAQs

What does Mountain Trike use Flowlens for?

Mountain Trike runs its whole order process in Flowlens: website enquiries, CRM and sales leads, quotes, sales orders, invoicing linked to Xero, MRP for production and job cards, purchasing, stock control, dispatch and servicing.

How does Flowlens handle stock for a product with hundreds of components?

Each Mountain Trike is built from around 400 components. The model’s bill of materials is attached to each job, so dispatching it deducts exactly those parts, including any accessories the customer ordered. Goods received notes update stock when deliveries arrive.

Did Flowlens reduce Mountain Trike’s lead times?

Build lead times fell from 12–14 weeks (20–25 at peak) to around 2–4 weeks. Supply chain changes and bringing chassis fabrication in house were the main drivers, and Flowlens helps Mountain Trike manage that in-house production with Projects, Job Cards and Purchase Orders.

How long does it take to set up Flowlens for a manufacturer?

Mountain Trike brought Flowlens in a stage at a time, starting with invoicing and then stock. The main effort was collating the BOMs into components lists and listing every part. Once that was done, updating components lists was simple.

Is Flowlens suitable for a small manufacturing team?

Mountain Trike had a team of nine when it started using Flowlens. Tim says a single system covering sales, purchasing, production, stock and servicing is especially valuable when you’re a small team and efficiency is everything.

Share:
FEARLESS Digital Transformation for SME Manufacturers

Want to avoid common mistakes?

Get your FREE Digital Transformation roadmap!